Solar Permit Solutions
Jacksonville, FL

Solar Permit Design In Jacksonville, FL

Professional solar permit design and engineering services in Jacksonville, FL. Permit-ready plan sets delivered fast.

PE Stamped Plans
2-5 Day Turnaround
All 50 States
NEC & IBC Compliant
Solar Permit Design in Jacksonville, FL: City of Jacksonville solar permit application and approval flow chart showing digital submission, plan review, permit issuance, and inspection process.

Solar permitting in Jacksonville, FL, requires contractors to submit comprehensive plan sets, including site, electrical, and structural drawings, through the Building Inspection Division via the JaxEPICS portal prior to installation. Typically managed by the installer, the approval process runs 2–4 weeks and demands full compliance with Florida Building Code, NEC Article 690, and JEA interconnection standards.


Key Aspects of Jacksonville Solar Permitting:

  • Application Process: Submissions must include detailed site plans, electrical wiring diagrams, structural engineering calculations, and equipment spec sheets.
  • Permit Submission: All applications are filed electronically through the City of Jacksonville’s JaxEPICS system.
  • Requirements: A Green Energy Permit Application Form must be submitted alongside a signed JEA interconnection agreement.
  • Inspections: A final field inspection is mandatory post-installation to confirm the system matches the approved permit drawings.
  • Timeframe: The full project timeline, from permit submission to final sign-off, generally falls within 3 to 6 weeks.
  • Engineering: Plan sets require a professional engineer’s stamp and seal for certain system thresholds, such as residential systems exceeding 600 amps.

In surrounding jurisdictions like Jacksonville Beach, additional green energy permit checklists with more detailed documentation may apply. Solar Permit Solutions handles the complete design and permitting process for Jacksonville and Duval County projects, delivering permit-ready plan sets that meet all local AHJ, Florida Building Code, and JEA requirements so contractors can focus on installation.

Solar Permit Design Services in Jacksonville, FL

Our Jacksonville, FL solar permit design team delivers full-service residential and commercial plan sets engineered to pass inspection the first time. Every permit package is drafted by licensed professionals who understand Duval County building codes, local AHJ submission standards, and Florida-specific structural and electrical requirements – so your projects move from approval to installation without costly revision delays.

 
 

Site Plans

Precise site plans detailing panel array layout, required setbacks, and property boundaries – built to meet Jacksonville and Duval County permit submission standards for fast AHJ approval.

Electrical Drawings

Full electrical one-line and three-line diagrams engineered to meet Florida Building Code and NEC standards – designed for seamless Jacksonville permit approval and JEA interconnection requirements.

Structural Calculations

PE-stamped structural calculations and engineering reports tailored to Duval County building department standards – ensuring your Jacksonville solar projects meet Florida wind load, roof loading, and hurricane-rated fastening requirements for first-pass approval.

Why Choose Our Jacksonville, FL, Solar Permit Design Services?

  • Licensed engineers familiar with  Florida building codes
  • Fast turnaround times for permit-ready designs
  • PE-stamped calculations and drawings
  • Direct experience with Jacksonville AHJ requirements
  • Complete permit package preparation
  • Revision support through approval

Ready to Start Your Solar Project in Jacksonville, FL?

Get professional, permit-ready plan sets designed for your local building department requirements. PE-stamped plans delivered in 2-5 business days.

Frequently Asked Questions — Jacksonville, FL

What solar permit services do you offer in Jacksonville, FL?

We provide complete solar permit design packages for Jacksonville, FL, including site plans, electrical diagrams, structural details, and PE-stamped engineering documents. Our designs are accepted by local building departments and AHJs.

How long does it take to get my permit plans?

Most residential permit plan sets are completed within 2-5 business days. Commercial projects may take 5-10 business days depending on complexity. Rush services are available.

Do you handle the permit submission process?

We design your permit-ready plan set so you or your contractor can submit it directly to your local building department. We also provide support if the AHJ requests revisions.

What information do I need to get started?

To get started, we need your property address, proposed system size, equipment specifications (panels, inverters, racking), and roof type. Submit these details through our online intake form for a quick quote.