Why Solar Makes Sense in Miami, Florida
Miami receives over 249 sunny days per year, making it one of the best cities in the US for solar energy production. Miami-Dade County has streamlined its solar permitting process, but navigating local utility interconnection requirements with FPL (Florida Power & Light) still requires professionally stamped plan sets.

Solar permitting in Miami involves submitting professionally signed, sealed, and digitally formatted plan sets through the Miami-Dade County electronic portal, ensuring full compliance with High Velocity Hurricane Zone (HVHZ) building standards. A state-licensed contractor is responsible for filing the building permit application, the accompanying electrical fee sheet, and a completed Notice of Commencement (NOC). Residential solar projects in certain municipalities can bypass a standalone roof permit, though commercial installations consistently require one.
Key details for the solar permitting process in Miami:
- Documentation: Applicants must provide a notarized Building Permit Application, complete electrical plan sets (covering site plans, elevation drawings, and structural/electrical engineering calculations), and a valid Notice of Acceptance (NOA) for all rooftop-mounted equipment.
- Approval Process: All submitted plans require the signature and seal of a Florida-licensed professional engineer or registered architect before the county will accept them for review.
- City Specifics:
- City of Miami: Residential solar installations do not require a separate roofing permit, but commercial projects do.
- Miami Beach: Provides an expedited permitting track with a 5-day turnaround and waives all permit fees for qualifying solar PV systems.
- South Miami: Waives permit fees entirely for solar photovoltaic installations.
- Inspections: Projects must pass structural, electrical, and roofing inspections, and a “roof-in-progress” inspection is frequently required before work can continue.
- Timeline: From initial submission to final approval, the process generally takes 2 to 6 weeks depending on project scope and municipality-specific regulatory requirements.
Applicants seeking pre-submission guidance can schedule staff consultations through the MeetQ online scheduling system.
Navigating Miami-Dade’s HVHZ requirements and municipality-specific rules can add significant time and complexity to any solar project. Solar Permit Solutions handles the entire permitting process from start to finish, including professionally engineered plan sets, sealed drawings, permit application filing, and inspection coordination across all Miami-Dade jurisdictions. Whether you’re working on a residential rooftop system in South Miami or a commercial installation in Miami Beach, our team ensures your permit package meets every local requirement the first time – so you can stay focused on installation, not paperwork. Get a free quote today and let us take permitting off your plate. Contractors can focus on installation.
Our Solar Permit Design Services in Miami, FL
- Permit-Ready Residential Solar Plan Sets for Miami homeowners
- Commercial Solar Permit Plans for businesses in Miami
- PE-Stamped Structural and Electrical Drawings
- Utility Interconnection Documentation (Florida Power & Light (FPL))
- Miami-Dade County Building Department compliant plan sets
- Ground-Mount and Rooftop System Designs
- Rapid Shutdown and Power Optimizer compliance drawings
- Fast 2–4 business day turnaround on most projects
Site Plans
Precise site plans detailing panel array layout, required setbacks, and property boundaries – engineered to meet Miami-Dade County HVHZ permit submission standards for fast AHJ approval.
Electrical Drawings
Full electrical one-line and three-line diagrams engineered to meet Florida Building Code, NEC, and High Velocity Hurricane Zone standards – designed for seamless Miami-Dade permit approval and FPL interconnection requirements.
Structural Calculations
PE-stamped structural calculations and engineering reports tailored to Miami-Dade County building department standards, ensuring your Miami solar projects meet Florida wind load, roof loading, and HVHZ hurricane-rated fastening requirements for first-pass approval.
Why Solar Permit Solutions for Your Miami Solar Permit?
- Licensed Professional Engineers with Florida experience
- All 50 states covered – one team for all your projects
- 2–4 business day delivery on most plan sets
- Permit-ready drawings the first time – fewer revision cycles
- Residential, commercial, and off-grid systems
- PE stamps available for all states requiring engineering certification
- Familiar with Miami-Dade County Building Department requirements
Ready to Start Your Solar Project in Miami, FL?
Get professional, permit-ready plan sets designed for your local building department requirements. PE-stamped plans delivered in 2-5 business days.