Full-Service Solar Solutions in Orlando
We deliver comprehensive solar design and permitting solutions throughout Orlando, Florida. Our services cover all phases from preliminary system engineering to final permit authorization, managing every technical component of your solar installation, enabling you to concentrate on implementation and client relations.
Solar System Design
- Customized array configurations for Orlando installations
- Component selection and technical specifications
- Energy output projections and analysis
- Shading evaluation and solution planning
- Electrical design and diagrams
- Structural load analysis and engineering computations
Permit Services
- Comprehensive permit set development
- Filing submissions with Orlando authorities
- Plan review corrections and updates
- Building department communication
- Inspection arrangement and assistance
- Final clearance documentation
Why Choose Our Orlando Services?
Our team carries substantial expertise working on solar projects throughout Orlando, FL. We possess thorough familiarity with regional code standards, AHJ requirements, and the distinct complexities of installing solar in Florida. This proficiency drives quicker approvals, minimized revision cycles, and streamlined project outcomes.
Complete Project Support
From the first site assessment to the final inspection sign-off, we provide comprehensive support for your Orlando solar projects. Our integrated design and permitting service ensures consistency, reduces errors, and accelerates your project timeline.
Our Service Areas in Florida
We serve Orlando and surrounding areas throughout Florida, providing solar design and permitting services for residential, commercial, and utility-scale projects. Our local expertise and established relationships with FL building departments ensure efficient permit processing and approval.
Get Started with Your Orlando Solar Project
Reach out to our team for full-service solar design and permitting solutions in Orlando, Florida. Get in touch today to get started.

Orlando Solar Permit Design: Complete Requirements & Process Guide
Obtaining solar permits in Orlando, Florida, demands comprehensive structural and electrical documentation submitted to the City of Orlando to verify adherence to municipal building and fire safety regulations. Essential elements encompass site layouts, roof structural evaluations, and electrical schematics, frequently necessitating certification stamps from licensed professional engineers (PE). The procedure includes filing permit applications, procuring a Recorded Notice of Commencement, and obtaining clearances for both construction permits and utility grid connection authorization.
Essential Requirements for Orlando Solar Permitting:
- Submission Procedures: Solar installations must go through the City of Orlando’s digital submission platform with complete construction documentation.
- Mandatory Documents: Plan sets must contain equipment specifications, electrical single-line and three-line diagrams, property site layouts, and engineering calculations for roof structural capacity.
- Code Adherence: Installations must satisfy municipal fire safety and building standards, including array setback requirements and the “33% coverage limitation” for rooftop-mounted systems.
- Dual Permit Requirements: Projects typically necessitate separate building permits (covering structural mounting systems) and electrical permits (addressing grid interconnection).
- Homeowners Association Considerations: Despite Florida’s statutory solar access protections, HOAs maintain authority to conduct aesthetic design evaluations.
- Engineering Certification: Sealed plan documents from Florida-registered professional engineers are typically mandatory for streamlined approval processing.
Orlando Solar Permitting Workflow:
- Design & Engineering Phase: Develop location-specific photovoltaic system blueprints with structural calculations.
- Application Filing: Upload engineered plans alongside the Recorded Notice of Commencement through the municipal portal.
- Plan Review Stage: City building officials evaluate submissions for regulatory compliance verification.
- Authorization Issued: Following successful review, installation permits are released for construction commencement.
- Final Inspection: Concluding inspection appointments are mandatory for permit closure and certificate of completion.
Key Considerations:
- Service Provider: If your home is serviced by OUC (Orlando Utilities Commission), ensure your system meets their interconnection requirements.
- Unincorporated Orange County: If you are outside city limits, you will use the Orange County permit system.
- HOA: While Florida law protects your right to install solar, check for specific HOA guidelines.
Ready to Start Your Solar Project in Orlando, FL?
Get professional, permit-ready plan sets designed for your local building department requirements. PE-stamped plans delivered in 2-5 business days.