Solar Permit Solutions
Dallas, TX

Solar Permit Services In Dallas, TX

Professional solar permit design and engineering services in Dallas, TX. Permit-ready plan sets delivered fast.

PE Stamped Plans
2-5 Day Turnaround
All 50 States
NEC & IBC Compliant

Looking for reliable solar permit services in Dallas, TX? Solar Permit Solutions provides professional solar permit design, engineering documentation, local permitting support, and utility interconnection assistance for residential and commercial solar projects.

Whether you’re a solar installer managing multiple projects, an EPC company expanding into Texas, or a property owner preparing for a solar installation, our team helps simplify the documentation and approval process.

We prepare permit-ready solar plan sets, coordinate engineering requirements, assist with local AHJ submissions, and support solar utility interconnection applications through Permission to Operate (PTO).

From rooftop solar and ground-mounted systems to battery storage installations, Solar Permit Solutions helps keep your Dallas solar projects organized and moving forward. Curious about cost? See our solar permit design pricing.

Need help with a Dallas solar permit? Contact our team to discuss your project.

Solar Permitting Requirements in Dallas, TX

Solar installations within Dallas city limits must comply with applicable City of Dallas construction codes, electrical requirements, zoning regulations, and building safety standards.

In the City’s DallasNow permitting system, solar projects are filed under the Residential Solar/PV Permit or Commercial Solar/PV Permit record type. The electrical work is then permitted through an electrical trade permit linked to that solar record. Depending on the project design, additional building or structural review may also apply, particularly for roof-mounted solar arrays.

The City requires electrical permits to be pulled by an appropriately licensed professional who is registered with the City of Dallas. For electrical work, that means a registered Master Electrician, and journeyman electricians cannot pull permits independently. Contractors must also register in DallasNow before they can pull permits.

For solar installers and contractors, understanding these requirements before submitting an application can help prevent incomplete documentation and unnecessary review delays.

Official resource: City of Dallas Planning & Development Guide

Applicable Dallas Building and Electrical Codes

The City of Dallas currently publishes the following adopted construction codes:

  • 2021 International Building Code (IBC), with Dallas amendments.
  • 2021 International Residential Code (IRC), with Dallas amendments.
  • 2023 National Electrical Code (NEC), with Dallas amendments.
  • 2021 International Fire Code (IFC), with Dallas amendments.
  • 2021 International Energy Conservation Code (IECC), with Dallas amendments.

The 2021 ICC construction codes became effective May 12, 2023. The Dallas City Council adopted the 2023 NEC on April 23, 2025, and it took effect May 23, 2025, replacing the 2020 NEC that had been in force since June 13, 2022.

Among the Dallas amendments to the 2023 NEC, the City’s notice to electrical contractors highlights a change to NEC 705.8 that defines qualified people for interconnected power supply systems, which directly affects solar and storage work. It also notes that an emergency disconnect is required when service equipment is replaced, which matters on projects that include a main panel upgrade.

Solar plan sets should account for applicable electrical, structural, fire safety, and building requirements based on the property and system configuration.

Official resources:

How to Obtain a Solar Permit in Dallas

The City of Dallas uses its DallasNow online permitting system for permit applications and related permitting services.

A typical solar permitting process involves the following steps:

1. Prepare the Solar Permit Plan Set

Before applying for a solar permit, the project should have complete technical documentation.

Depending on the installation, the plans may include:

  • Solar panel layout and roof plan.
  • Site plan showing the property and proposed solar installation.
  • Electrical single-line diagram (SLD).
  • Inverter, battery, and equipment specifications.
  • Electrical calculations and conductor sizing.
  • Structural calculations and mounting details.
  • Engineering documentation and applicable PE stamps.

The plans should reflect the actual equipment and installation configuration. Our residential solar permit plans and commercial solar permit design services cover each of these elements.

2. Submit the Solar/PV Permit Application

The applicable Solar/PV permit is processed through the City of Dallas permitting system, DallasNow.

The permit application must be handled by an appropriately authorized applicant or licensed professional registered with the City, as required for the permit type.

The application and supporting documents are reviewed for compliance with applicable City requirements. The City’s guide lists solar/PV projects without battery storage as typically reviewed within about 24 hours after the plan review fee is paid, though actual timelines vary with submittal quality and reviewer workload.

3. Address Plan Review Comments

If the City reviewer requests additional information or corrections, the applicant must provide the required revisions. In DallasNow, the Plan Review tab is visible only to the Applicant, so reviewer comments need to be shared with the design team.

Common documentation issues can include:

  • Missing electrical specifications.
  • Incomplete single-line diagrams.
  • Insufficient structural documentation.
  • Missing equipment information.
  • Inconsistencies between the plans and proposed installation.

Solar Permit Solutions can assist with reviewing applicable comments, preparing required drawing revisions within the agreed scope, and coordinating updated documents for resubmission.

4. Permit Approval and Installation

Once the City approves the application and issues the required permit, the installation can proceed in accordance with the approved documents and applicable requirements.

The responsible contractor must complete the installation and arrange required inspections.

5. Final Inspection and Utility Interconnection

After installation, the project must complete the applicable local inspection requirements. Electrical inspections are scheduled through the electrical trade permit record in DallasNow. For a closer look at what inspectors check, read our guide to solar inspection requirements.

The utility interconnection process is separate from the City building permit process.

For projects served by Oncor, the customer and installer must complete the applicable interconnection requirements and receive Permission to Operate before operating the solar system in parallel with the grid.

Solar Permit Submission Through DallasNow

DallasNow is the City’s online platform for submitting and managing permits. Applicants need a free DallasNow account to apply, pay fees, and track records.

For solar photovoltaic projects, the City uses dedicated Residential Solar/PV and Commercial Solar/PV record types, with electrical work permitted through a linked trade record.

This distinction is important for contractors preparing solar applications because the permit category, applicant qualifications, and supporting documentation must match the actual project. When a trade record is linked to a primary solar record, the primary record number must be entered exactly, or the inspections will not link correctly.

The City may require additional approvals depending on the project scope, property conditions, and installation design.

Solar Permit Solutions helps customers prepare organized permit documentation and coordinate revisions when additional information is requested.

Official resources:

Utility Service Areas in Dallas, Texas

Understanding the electric utility serving a project is essential before preparing a solar interconnection application.

Oncor Electric Delivery is the primary transmission and distribution utility serving much of the Dallas–Fort Worth region.

Oncor maintains the local electric delivery infrastructure, including distribution lines and meters. It is responsible for reviewing and approving applicable distributed generation interconnection requests within its service territory.

However, not every address in the broader Dallas metropolitan area should automatically be assumed to receive Oncor service. Some locations may be served by municipal utilities or electric cooperatives.

Before preparing an interconnection application, the project’s electric delivery provider should be confirmed using the service address or Electric Service Identifier (ESI ID).

Check the Oncor Service Territory

Oncor and Retail Electric Providers: What’s the Difference?

Texas has a competitive retail electricity market in many areas.

It is important to distinguish between:

Oncor Electric Delivery (TDU):

  • Maintains the electric distribution infrastructure.
  • Reviews applicable solar interconnection applications.
  • Coordinates interconnection agreements.
  • Issues Permission to Operate.
  • Coordinates meter programming for surplus generation measurement.

Retail Electric Provider (REP):

  • Sells electricity to the customer.
  • Provides the customer’s electricity plan.
  • May offer solar buyback or surplus generation credit programs.
  • Establishes the terms under which eligible excess solar generation is credited.

Oncor does not determine the customer’s retail electricity buyback plan. Customers must review available options and enter into an appropriate agreement with their chosen retail electricity provider. Plans can be compared at Power to Choose.

Oncor Solar Interconnection Process in Dallas

Solar installations connected to the Oncor distribution grid require a separate interconnection application.

Obtaining a local solar building permit does not automatically authorize a system to operate in parallel with the utility grid.

For certified inverter-based residential and small commercial systems, Oncor generally follows this process:

Step 1. Prepare the Interconnection Application

The installer prepares the application with the project information, equipment details, and technical documentation.

Depending on the system, documentation may include:

  • Solar inverter specifications.
  • PV module information.
  • Battery storage specifications, if applicable.
  • Electrical single-line diagram.
  • System capacity and configuration.
  • Required customer and installer information.

Oncor also requires warning placards on all distributed generation projects to alert utility employees to a possible alternate source of power. See the Oncor Placard Guideline.

Step 2. Submit the Tariff Application

The installer provides the customer with the applicable Tariff Application for review and signature.

This document initiates the utility’s interconnection review.

Step 3. Submit Through the Oncor Installer Portal

The installer submits the solar project through Oncor’s web-based interconnection portal.

Oncor reviews the application and supporting technical documents to determine whether the proposed system meets its interconnection requirements.

Step 4. Utility Review and Interconnection Agreement

Oncor reviews the proposed system and may perform additional studies depending on the project configuration.

After completing the applicable review, Oncor prepares the Interconnection Agreement for the required parties to sign.

Step 5. Permission to Operate (PTO)

Once the interconnection review is complete and the required agreement is signed, Oncor issues the Permission to Operate letter to the customer and the installer.

The solar system should not be operated in parallel with the utility grid until the required approval and PTO have been received. Learn more in our guide to solar Permission to Operate.

Step 6. Meter Programming

After PTO is granted, Oncor initiates the applicable meter reprogramming process to measure electricity consumed from the grid and surplus generation exported to the grid.

Oncor indicates that meter reprogramming generally takes about three weeks, although actual processing depends on the project and applicable requirements. Measured surplus generation is then reported to the customer’s retail electric provider, generally within 30 to 60 days of PTO.

Official resources:

Solar Permit Design and Engineering Services in Dallas

Solar Permit Solutions supports residential and commercial solar projects in Dallas with professional design documentation and engineering coordination.

Our services include:

Residential Solar Permit Design

We prepare residential solar permit plan sets for rooftop and ground-mounted systems. Most residential plan sets are completed within 2 to 5 business days.

Depending on project requirements, documentation can include:

  • PV module layout.
  • Site plan.
  • Electrical single-line diagram.
  • Equipment specifications.
  • Structural calculations.
  • Engineering review and PE stamping.

Explore our residential solar permit plans.

Commercial Solar Permit Design

Commercial solar installations often require more detailed electrical and structural documentation.

We support commercial PV projects with coordinated engineering drawings, system calculations, equipment documentation, and applicable professional engineering review. Learn more about our commercial solar permit design services.

Solar Battery Storage Permits

Battery installations require appropriate electrical and equipment documentation.

We help prepare plans for solar-plus-storage projects, including battery locations, inverter configurations, electrical connections, and applicable safety documentation. Oncor requires an interconnection agreement for any battery system that operates in parallel with the utility, even briefly, so storage projects should be reviewed early. See our overview of solar battery permit requirements.

Structural and Electrical Engineering

Our engineering coordination services include:

  • Structural calculations and analysis.
  • Electrical system calculations.
  • Single-line diagrams.
  • PE-stamped and sealed plans, where required and within the engineer’s licensing jurisdiction.

Local AHJ Submission Support

Already have your solar drawings?

Solar Permit Solutions can also assist with local permit documentation, application coordination, reviewer comments, and drawing revisions for projects designed by other providers.

Permit applications must be submitted and obtained by the appropriately authorized applicant or licensed professional under the applicable City requirements.

Utility Interconnection Assistance

We help organize the technical documents and application information required for utility interconnection.

For Oncor-served projects, this may include coordinating equipment documentation, electrical diagrams, application corrections, and supporting records through the interconnection process.

Actual portal submission and customer signatures must be completed by the authorized installer or customer, as applicable.

Why Choose Solar Permit Solutions for Your Dallas Solar Project?

Working with a solar design and permitting support team can help installers and EPC companies manage documentation more efficiently.

Solar Permit Solutions provides:

  • Residential and commercial solar plan sets.
  • Electrical and structural engineering coordination.
  • PE-stamped and sealed documentation where required.
  • Solar and battery storage design support.
  • Permit documentation and submission coordination.
  • Reviewer comment assistance and drawing revisions.
  • Utility interconnection documentation support.
  • Support for projects designed by other providers.

We work with solar installers, EPC companies, contractors, and property owners who need dependable design and permitting support.

Whether you are managing one residential installation or multiple commercial projects, our team can help organize the documentation needed to move your project forward.

Ready to Start Your Solar Project in Dallas, TX?

Get professional, permit-ready plan sets designed for your local building department requirements. PE-stamped plans delivered in 2-5 business days.

Frequently Asked Questions — Dallas, TX

What solar permit services do you offer in Dallas, TX?

We provide complete solar permit design packages for Dallas, TX, including site plans, electrical diagrams, structural details, and PE-stamped engineering documents. Our designs are accepted by local building departments and AHJs.

How long does it take to get my permit plans?

Most residential permit plan sets are completed within 2-5 business days. Commercial projects may take 5-10 business days depending on complexity. Rush services are available.

Do you handle the permit submission process?

We design your permit-ready plan set so you or your contractor can submit it directly to your local building department. We also provide support if the AHJ requests revisions.

What information do I need to get started?

To get started, we need your property address, proposed system size, equipment specifications (panels, inverters, racking), and roof type. Submit these details through our online intake form for a quick quote.